Warning: Power transformer assembly

AVForums

Help Support AVForums:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Ampdog

R.I.P. 23 June 2022
Joined
Aug 27, 2006
Messages
7,611
Reaction score
455
Location
Pretoria, South Africa
Most of us have read about this some time or another, but I wonder how many had the experience: Assembling a (power) transformer core with non-insolated screws/bolts, and finding that it mattered.

I recently assembled a 35mm stack of E-I laminations transformer and two aluminium end covers, screwed tight with four uninsulated screws and nuts through the ends - and upon switching on found the screw ends burning my fingers after a few minutes. The core got the normal luke-warm after some 20 minuts, while the screw ends quickly reached some 80? C.

Examination lead to a potential difference of some 130mV over the relevant hole ends. Not a very high voltage, but when shorted by a 5mm metal screw ....  I wanted to measure the energy dissipated, but could not take  the necessary vector amplitude readings. I used fiber insulating washers on both ends of all four relevant screws; all then adopting the normal rising temperature of the core.

I believe part of the problem is the aluminium (shorting) end bells. Aluminium conducts electricity far better than steel - the steel end bells usually used. I have also seen screws/bolts themselves insulated with non-conductive fiber sleeve.  Heat shrink tubing should suffice; one uses thin enough screws to accomodate the sleeves.

There then, to folks assembling E-I transformer cores.  This was the first such experience in my long years with electronics, still ......
 
Top